- Joined
- 7 Aug 2004
- Posts
- 11,259
Dutch Guy said:What you can try is make the X-axis a lot longer with intervals of 10 minutes instead of one hour intervals, that way you can plot both the values on the timeline.
How would I achieve this in excel ? also how do I make the 2nd Y axis on the right - like i said i really dont know how to do it, dont even know what buttons to press
