Hi Guys,
Currently running a XSPC 360 rad, XSPC Raystorm CPU block and XSPC Twin res. I have just ordered a new GFX card and waterblock so need to jig my loop order.
I was thinking Pump --> Rad --> CPU --> GPU --> Pump.
Would this be ok or do I need to go Pump --> CPU --> Rad --> GPU --> Pump?
Currently running a XSPC 360 rad, XSPC Raystorm CPU block and XSPC Twin res. I have just ordered a new GFX card and waterblock so need to jig my loop order.
I was thinking Pump --> Rad --> CPU --> GPU --> Pump.
Would this be ok or do I need to go Pump --> CPU --> Rad --> GPU --> Pump?