Over that kind of terrain I would plan around a tracked vehicle, you can get RC tanks easily but they do cost a bit more.
Used to play around quite a bit with off road 4x4's a while ago and they aren't fantastic through some types of terrain like tall grasses etc and can get bogged, you also want something (imho) that is fairly slow due to the nature of how it will be used.
Keeping it charged may also be fun.
check out fishpi.org as well.
Put me down but being in Aus I'm out of the time zone to be really useful. I do have some idea with where to get stuff though.
thinking about it, a tracked system would be the way to gofor ease of programming. electronic compass and just have it turn until the new vector matches the required. you would also need anti-rollover measures in place.
charging would be a chore, maybe taking a few days. you would have to work out a way to deploy a solar array. but its not toooo difficult.
thinking about it, a tracked system would be the way to gofor ease of programming. electronic compass and just have it turn until the new vector matches the required. you would also need anti-rollover measures in place.
charging would be a chore, maybe taking a few days. you would have to work out a way to deploy a solar array. but its not toooo difficult.
I have absolutely no technical expertise or advice to give on something such as this.
I will however, be prepared to donate £25 to the cost of something for the project as long as the vehicle has a sticker of some sort on it that says 'Lucy Is Cool'.
Exactly what I was thinking
Cool I guess we will have to figure out what we need to know, I think the main jobs will be:
1) Hardware and electrical engineers
2) Software programmers – raspberry pi geniuses (possibly Atom boards?)
3) Software and radio techs for long distance radio control
4) Weather station and scientific payload bods
5) Cad designers – theoretical mathematicians and physicists ?
Anything else? Thinking design it online with shared folders and input until we have everything down to the T and then build it to exact specification – will take many weeks of designing I think but at least everyone can be involved