For those of you desperate to find out how this turned out;
Pre-work
Hardcore I had delivered
Digging out the soil
Laying the hardcore
Laying the MOT
Compacted down
Gravel going on
Testing it all!
I'm absolutely exhausted - the entire thing was done over the space of about 24 hours and pretty much all by myself. I work in IT and this is my first go at anymore more challenging than IKEA furniture so I'm happy with the results.
The gravel needs to be levelled and we need to decide what to do with the final 0.75m.
The soil will hopefully go via my BIL over the next few days. I did want to go for the gravel grid but the pricing put me off, we will see if it's a mistake or not!
It looks miles better than before and my only grip is the raised water company access drain but I'm not sure what I can really do about that.
Costings (so far)
2x MOT and 2x gravel - £180
Compactor hire - £29
Hardcore - £Free
Digging - £Free
Weed membrane - £26
Soil removal - £100 (tbc)
Total to be just over £300 all in.