Ah yes, I had not spotted that, that really is cheeky calling it ultra rapid then. You'll be stuck at 125A / 50kw @ 400V if the other charger is in use. At least it will probably work as its:Also looks like it is a pairing system, so 125kW only if the paired partner charger isn't in use? Like you say though, better than nothing
“We have available two different
types of battery chargers - the Pulse 150, has a 196kw battery, which is more than three times the size of the battery used in the UK’s bestselling EV, the Tesla Model 3.
“It charges using 40kW input power. It trickle charges constantly, and can charge two cars at greater than 100kw at the same time.
“It’ll do more than 20 charges back-to-back-to-back… while continually recharging itself. Retailers would only need a low-power grid connection. The BP Pulse 120, produced by Freewire, takes as little as 20kW input power. One of good things about the battery chargers is that they’re not putting strain on the grid through drawing high-power, they’re taking a continuous low power feed and storing the power.”
OEM warranty will typically be 10 yearsBattery pack buffering really isn’t ideal, it significantly increases the cost to deploy chargers and lowers the return on investment. I’d imagine that battery isn’t going to last very long is it is used back to pack on the daily.
But yeh, I imagine they will be deployed out in the sticks, however, I expect most forecourt’s are very power limited these days already and as such they’ll be looking to deploy these everywhere. Really they should be looking to deploy a minimum of 4 chargers, so really you need 120kw or more as a sustained power input.
It’s worth noting that Tesla has ‘mega packs’ deployed at South Mimms and has done for years. It still doesn’t stop the site being **** at peak times.
Battery pack buffering really isn’t ideal, it significantly increases the cost to deploy chargers and lowers the return on investment. I’d imagine that battery isn’t going to last very long is it is used back to pack on the daily.
But yeh, I imagine they will be deployed out in the sticks, however, I expect most forecourt’s are very power limited these days already and as such they’ll be looking to deploy these everywhere. Really they should be looking to deploy a minimum of 4 chargers, so really you need 120kw or more as a sustained power input.
It’s worth noting that Tesla has ‘mega packs’ deployed at South Mimms and has done for years. It still doesn’t stop the site being **** at peak times.
I never said it was cheaper, I just said it’s not ideal….Or it’s way cheaper than putting a decent grid feed in.
Don’t confuse your opinion with fact. Cheers
The cynical side of me thinks these will just start getting deployed where really a big fat grid connection should be being put in. That’s U.K. 101 right there, go cheap and probably not fit for purpose.Oh come on. Second part of a sentence just after the comma said literally that!![]()
Uk 101 is people moaning about anything that’s trying to make progressThe cynical side of me thinks these will just start getting deployed where really a big fat grid connection should be being put in. That’s U.K. 101 right there, go cheap and probably not fit for purpose.
EV carbon manufacture costs have dropped from earlier discussion of 50 odd tonnes ?I ran some analysis of the total C02 outputs of my current EV, Polestar 2 and previous car, BMW 520d: build and use - interesting results. EV is significantly less over the 3 year use periods.