COMPOSITE COSTING SHEET (Excel Document)
Client: Your Ref:
Our ref:
Date:
Quotation for Geotechnical Investigation and Preliminary Geoenvironmental Assessement
For At
Anticipated Scope of Investigation:
Item Brief Description Prov.Qty Unit Rate £ Amount £
A. GEO DESK STUDY, RECONNAISSANCE, CONCEPTUAL MODEL A. SUB TOTAL
1 Geoenvironmental Desk Study 0 Sum 450 0
1.a. Coal Mining Archive Report 0 Sum 100 0
2a. Site Reconnaissance 0 Sum 250 0
2b. Conceptual Model 0 Sum 150 0
B. ENGINEERING DIRECTION, SUPERVISION, REPORTING B. SUB TOTAL
3 Project/Senior/Engineer/Geologist. 0 Day 275 0
Organise( ), supervise( ), schedule ( ), Compute ( ), interpretative report ( ).
4 Associate. Manage/direct( ) report( ). 0 Day 375 0
5 Principal. Special advice 0 Day 475 0
6 Geotechnician. Monitor, sample, enter data 0 Day 175 0
7 Consultant. Special advice 0 Day 500 0
8 Car Travel ( Trips at mls) 0 Ml 0.6 0
9 Accommodation and subsistence 0 Prov.Sum 0
10 Collate Reports( copies @ £ ) 0 Prov.Sum 0
C. UNSHORED MECHANICAL TRIAL PITTING C. SUB TOTAL
11 Mob/Demob Excavator plus Operator 0 Sum 0
12 JCB Backhoe, Mini or Micro Digger (8hr day) 0 Day 200 0
13 Breaker Attachment 0 Day 75 0
14 Simple 3m Gas Standpipe (Push) 0 No. 25 0
15 Project/Senior/Geologist supervision (inc.travel) 0 Day 325 0
CARRY FORWARD
BROUGHT FORWARD
D. CONVENTIONAL LIGHT CABLE PERCUSSION BORING D. SUBTOTAL
(Based on Jackson, Apex or P.Brine Rates)
29.b Project/Senior/Geologist supervision (inc.travel) 0 Day 325
E. ROTARY CORE DRILLING E. SUB TOTAL
(Based on Jackson, Tor or Apex Rates)
39b. Project/Senior/Geologist supervision (inc.travel) 0 Day 325
F. STANDPIPES, PIEZOMETERS, MONITORING F. SUB TOTAL
40 Simple Standpipe (push) 0 Each 20 0
41 Piezometer/Monitor Well (screw) 0 M 25 0
42 Simple Lockable Cover in concrete 0 No. 40 0
43 Technician to Monitor and Water Sample 0 Visit 225 0
44 Transport Well Materials (S+A Rig) 0 Visit 0
45 Transport Well Materials (Rotary Rig) 0 Visit 0
46 Transport Well materials (Window Sampling) 0 Visit 0
47 Photoionisation Detector (PID) 0 Day 75 0
48 Piezo Tip/Gas Valve Assembly 0 No. 25 0
G. ROTARY PERCUSSIVE PROBE DRILLING G. SUB TOTAL
(Based on Apex or Celtic Rock rates)
53 Project/Senior/Geologist supervision (inc.travel) 0 Day 325 0
H. WINDOW SAMPLING/DYNAMIC PROBING H. SUB TOTAL
(Based on Jackson, Apex or Tor Drilling Rates)
59 Project/Senior/Geologist supervision (inc.travel) 0 Day 325 0
J. LABORATORY TESTS J. PROV SUM
60-64 Classification (NMC,PI,Sieve,Hydrom)
65-71 Chemical (SO3, PH,Cl-)
72-78 Strength (Triaxial, Shear Vane)
79-85 Compaction, Rock, Permeability 0 0
K. CONTAMINATED LAND ANALYSES K. PROV SUM
Integrale Generic Suite( ), Leachate Suite( ), TPH
unspeciated( ), aliphatic-aromatic( ) speciated( )
BTEX ( ), VOC's ( ), PAH ( ), Asbestos ( ),
PCB's( ) WAC Tests( ), Other( ). 0 0
L. MISC. EQUIPMENT AND SERVICES L. SUB TOTAL
Bowser, Pump, Soakaways Technician 0 Day 300 0
BUDGET COST #NAME?
Notes: (Excl.VAT)
1 Integrale Conditions of Contract Apply.
2 2% discount on Integrale Fees and Disbursements offered for payment within 10 days of invoice.
3 Contingency: 10/15/20% recommended. To cover changes in scope of investigation/rate only items etc.