Well it's all happening chaps, and been a long time coming. Firstly, I have a one bedroom ground floor flat with own garden. Started proceedings in January for a lease extension. My lease extension premium has now finally been agreed at £28,600 which gives me 90 years added onto my remaining 64 years, so 154 years. It's peppercorn too so no more ground rent. My solicitors are currently finalising details and awaiting the new draft lease from the freeholders. I've got to pay the freeholder's solicitors and surveyors damn fees as well as my own solicitor and surveyor, so all told, it will have cost me about £36K.
So now I'm onto the final few hurdles before selling, which is decorating the rest of my flat. I had a lot of work done in 2012 including new kitchen, new bathroom, new windows throughout and a bunch of other external work, which cost over £20K.
But I never got around to doing my hall, bedroom and front room. So that's happening now. The kitchen and bathroom still look brand new, just needs some touching up here and there.
They started tuesday and it will probably take best part of 2 weeks to finish. New laminate flooring to go down, everything to be painted white, couple of new doors I think, new light fitting in front room. Communal areas also to be stripped and painted and I'll share the cost of that with the upstairs owner.
So here's my current gallery. I've been back and forth to the rubbish tip dumping carpet, underlay, wallpaper, etc. I've had to bag and box stuff up and just try and find space to move it to. First few pics show front room with stuff everywhere about to be removed, lol. So far, the front room and hall are now stripped and de-carpeted. Some filling has been done in hairline cracks around ceiling in front room, and some plaster will need removing in front room as it's showing signs of having blown.
http://postimg.org/gallery/krrpbj44/
So now I'm onto the final few hurdles before selling, which is decorating the rest of my flat. I had a lot of work done in 2012 including new kitchen, new bathroom, new windows throughout and a bunch of other external work, which cost over £20K.
But I never got around to doing my hall, bedroom and front room. So that's happening now. The kitchen and bathroom still look brand new, just needs some touching up here and there.
They started tuesday and it will probably take best part of 2 weeks to finish. New laminate flooring to go down, everything to be painted white, couple of new doors I think, new light fitting in front room. Communal areas also to be stripped and painted and I'll share the cost of that with the upstairs owner.
So here's my current gallery. I've been back and forth to the rubbish tip dumping carpet, underlay, wallpaper, etc. I've had to bag and box stuff up and just try and find space to move it to. First few pics show front room with stuff everywhere about to be removed, lol. So far, the front room and hall are now stripped and de-carpeted. Some filling has been done in hairline cracks around ceiling in front room, and some plaster will need removing in front room as it's showing signs of having blown.
http://postimg.org/gallery/krrpbj44/
so we're having to look into statutory course of action which could cost serious money to get anywhere with..








