We are having a building built at the back of our garden (7m by 5m and 1.8m ceiling height)... and for the last week the workers have been digging a 4-5 foot trench for the foundations.
My Dads just been having a go at me because I didn't ask when they started filling the trench up with rocks and conrete, if they had put the wire meshing inside. Apparently they haven't, and I was wondering if it actually needs it
I mean, I thought the meshing was to stop it cracking under pressure or when knocked really hard... 2ft wide by 4-5ft deep concrete isn't going to need meshing is it?

My Dads just been having a go at me because I didn't ask when they started filling the trench up with rocks and conrete, if they had put the wire meshing inside. Apparently they haven't, and I was wondering if it actually needs it
I mean, I thought the meshing was to stop it cracking under pressure or when knocked really hard... 2ft wide by 4-5ft deep concrete isn't going to need meshing is it?