When do you think it will be finished by?
Google chat later
When do you think it will be finished by?
anyway, filling didn't go to plan and there were two leaks. There is also a problem with the block I have emailed EK. how are they for their CS?
What problem did you have with the block?
The rubber ring n the inside was ripped. I have emailed EK. how ate they for CS?
.... you really haven't been very lucky
Good luck with the returns =D
Were your leaks just on barbs and the block? Unlucky mate
yeah the warranty sticker is usually on the side of the block, if it's not there they may refuse warranty I suppose
can you get an O ring to replace it from anywhere, saves time and messing about
omg im soooo jelous i really want a liquid cooling setup like this but am on a really tight budget anyway i can do a cheaper setup to this for under £100?
Looking good cleeecooo, have you done water cooling before? Fingers crossed you get a better bit of luck when you get back to finishing it off.
Not worth it. Dk it properly or not ar all £200 is a realistic budget.
omg im soooo jelous i really want a liquid cooling setup like this but am on a really tight budget anyway i can do a cheaper setup to this for under £100?
You could always try one of these, Mr Dubs speaks very highly of the kit, I'm thinking of using the same..
http://forums.overclockers.co.uk/showthread.php?t=18255454