Messy work done

Went with 10runs in the end just to make sure
The Floor:
Under The Floor and thru the woodwork:
This then runs down thru the wall located the cross beam and choppy chop:
Reoved the plasterboard section and used a fastcut on the beam behind.
Fed this down to the bottom of the wall to another bit choppy chop:
Then used the fastcut again on teh plate and floorboard at the bottom of the wall:
Then fed under the floorboards in the main room to the corner where everythings gonna be.
Everything cleared up and hoovered
Both section of plaster board wedged back in for the time being lol
Ignore the horrible wallpaper, curtain and carpet, it's all getting ripped out
