Ok my electrics are a bit old
http://i49.tinypic.com/3532rsz.jpg

Well not quite that old, new fuseboard is below (assumed rewired in the 70s). The extra pair you see coming off the breaker is the immersion heater
http://i47.tinypic.com/2na5par.jpg
Where I work loads of sparks will do me the work cheap, but they are all industrial guys so planning on getting them to do it but just get it tested.
To make it a bit more modern / safer thinking of replacing fuses with the plug in mcb's and get an RCD to replace the old voltage trip. Re earth it with 16mm cable (its an earth bar system, no earth on incoming). Then do something with the immersion heater (leave this upto the spark)
Does this sound a reasonable plan to you guys? Won't be perfect just a cheap way of getting a bit more modern.
http://i49.tinypic.com/3532rsz.jpg

Well not quite that old, new fuseboard is below (assumed rewired in the 70s). The extra pair you see coming off the breaker is the immersion heater

http://i47.tinypic.com/2na5par.jpg
Where I work loads of sparks will do me the work cheap, but they are all industrial guys so planning on getting them to do it but just get it tested.
To make it a bit more modern / safer thinking of replacing fuses with the plug in mcb's and get an RCD to replace the old voltage trip. Re earth it with 16mm cable (its an earth bar system, no earth on incoming). Then do something with the immersion heater (leave this upto the spark)
Does this sound a reasonable plan to you guys? Won't be perfect just a cheap way of getting a bit more modern.