Sic said:Wryel, i'm sorry - completely off topic but your sig intrigues me. care to explain?
Did you not see my old one? Apparently its a copy of the Mylo album cover...
Sic said:Wryel, i'm sorry - completely off topic but your sig intrigues me. care to explain?
Like matrioshki, in fact.cleanbluesky said:In order to build a crane, you need to use a silghtly smaller crane, so on and so on until you go back to the beginning and find the first crane which was assumbled with fishing rods
Ainscough's flagship, the 1000 tonne Liebherr LTM11000D, has erected the UK's tallest onshore wind turbine for Ecotricity, based in Stroud, Gloucestershire.
The 1000T, rigged with 160 tonnes of counterweight with a 47.6 metre boom, complete with 31.5 metre derrick mast and 56 metres of luffing fly, hoisted the hub of the Enercon E66 turbine 85 metres in to the air for fixing, before finally erecting the huge 66 metre blade into position.