18 Mar 2006 at 22:56 #21 buckeejit buckeejit Soldato Joined 14 Aug 2004 Posts 2,992 I've done 14 days in a row before, 9-5pm, 10-6pm and 2-10pm shifts. It was hell and I was so tired on the 14th day.
I've done 14 days in a row before, 9-5pm, 10-6pm and 2-10pm shifts. It was hell and I was so tired on the 14th day.