I set my loop up in december 13, just wondering how long i should leave it until i drain, flush and refil the loop.
I was thinking of a complete rebuild of the loop and adding a temp sensor+QDC's in August so i was thinking of leaving it until then unless it needs doing every 6 months or something.
I am using mayhems pre-mix i that makes any difference.
I was thinking of a complete rebuild of the loop and adding a temp sensor+QDC's in August so i was thinking of leaving it until then unless it needs doing every 6 months or something.
I am using mayhems pre-mix i that makes any difference.