I have an EK X-Res/Laing DDC combo and an EK XTX radiator in the bottom of my TJ07 at the moment and an EK Supremacy CPU block, I'm wanting to go from my pump/res combo to radiator to GFX to CPU back to GFX then back to res/pump.
The GTX FC-670 full-cover block is coming today and I just can't figure out how I can go to the GFX block first then to CPU then back to GFX and then the pump/res in the bottom.
I know I could just route tubing from the CPU back to the res/pump but I kinda want it clean and the tubing to go back to GFX then through the mid-plate directly back to the res/pump.
So what I'm asking is there some kind of additional block I need?
The GTX FC-670 full-cover block is coming today and I just can't figure out how I can go to the GFX block first then to CPU then back to GFX and then the pump/res in the bottom.
I know I could just route tubing from the CPU back to the res/pump but I kinda want it clean and the tubing to go back to GFX then through the mid-plate directly back to the res/pump.
So what I'm asking is there some kind of additional block I need?
Last edited: