Just bought a two bed maisonette in London, currently in rented accommodation and have about a week's grace to play with where the newly bought flat will be empty.
I am intending to do the below and in this order, would that be right?
1) Rip out the carpets revealing the floorboards
2) Sand said floorboards
3) Repaint the walls / ceiling
4) Varnish sanded floorboards
I'll be doing all of the above steps myself. One of the rooms possibly needs replastering or skimming, if so can I still crack on with step and 2 in that room? I presume I can?
I am intending to do the below and in this order, would that be right?
1) Rip out the carpets revealing the floorboards
2) Sand said floorboards
3) Repaint the walls / ceiling
4) Varnish sanded floorboards
I'll be doing all of the above steps myself. One of the rooms possibly needs replastering or skimming, if so can I still crack on with step and 2 in that room? I presume I can?