Well thought id show you guys some of my progress on the "major" refurbishment of my first house. I bought the house originally in May 2012, which basically i spent a year doing very little. But ill try an order the progress from the start to the present.
Plans - So the house is originally a 2 Bedroom, 1 Bath house, i plan to increase this to 3 bed, 2 bath. The house has a old 'barn' attached to it which we have got planning to knock through and increase the living area, both increasing the downs stairs kitchen to include a utility and store (which will house the UFH pump station/consumer unit/and new Combi boiler. It will also increase the bedroom 2 upstairs which will then become the master and have an en-suite added. Now as the kitchen is larger, im hoping to make it a kitchen/Dining room, and free up the old dinging room to create a 3rd down stairs bedroom.
24/6/2012 So this this is how it all started ,an amazing feeling when i got the keys for the first time. Being my first house it will be one big adventure haha. Heres some pictures of how it was, and bear in mind the people who owned it previously had been in there 55 years !!.
Kitchen-
Dining Room-
View of kitchen from Dining room-
Hallway-
Stairway-
Bedroom 1-
Bedroom 2-
Outside-
22/7/2012 Work started outside, to create a bit of privacy and gain some much needed space.
23/7/2012-25/7/2012 Further progress outside and removal of the horrid carpets in the bedrooms haha
21/2/2013 After a long break due to work, started work on the hallway and stairs. DEMOLITION has begun!
17/3/2013 So the planning came through and change of use, so commenced demolitions of the partition wall between the ' former stable' and house.
Much dust ????
LOL
30/3/2013 Ceiling height in the Stable heightened slightly, and the rotten timber joists removed.
Okay maybe i need a skip......
4/5/2013 Major work started forming the space for the new Bifold door , creating an entrance to the Kitchen. Not my most favourite time haha basically holding your house up with acro props.....
Oh god i hate stone walls , they just keep falling apart!!
While the foundation for the supporting wall was drying, increased the boundary wall to 6ft.
I beams installed.
Really happy with how it finished off... and 1 major job ticked off the big list of things to do.
17-19/5/2013 Time for a new floor !
7x3 joists, 5mm Steel wall plates, M24 SS Threaded rod. The outside still needs finishing of and pointing in.
1/3/2014 to 8/3/2014 - Started preparing the Kitchen/Utility ready for UFH to be layed. Screed is getting poured the following week.
What ill do is add the previous progress as i go along in the OP so more to come in the next few days, and all new progress in new posts in this thread.
Plans - So the house is originally a 2 Bedroom, 1 Bath house, i plan to increase this to 3 bed, 2 bath. The house has a old 'barn' attached to it which we have got planning to knock through and increase the living area, both increasing the downs stairs kitchen to include a utility and store (which will house the UFH pump station/consumer unit/and new Combi boiler. It will also increase the bedroom 2 upstairs which will then become the master and have an en-suite added. Now as the kitchen is larger, im hoping to make it a kitchen/Dining room, and free up the old dinging room to create a 3rd down stairs bedroom.
24/6/2012 So this this is how it all started ,an amazing feeling when i got the keys for the first time. Being my first house it will be one big adventure haha. Heres some pictures of how it was, and bear in mind the people who owned it previously had been in there 55 years !!.
Kitchen-
Dining Room-
View of kitchen from Dining room-
Hallway-
Stairway-
Bedroom 1-
Bedroom 2-
Outside-
22/7/2012 Work started outside, to create a bit of privacy and gain some much needed space.
23/7/2012-25/7/2012 Further progress outside and removal of the horrid carpets in the bedrooms haha
21/2/2013 After a long break due to work, started work on the hallway and stairs. DEMOLITION has begun!
17/3/2013 So the planning came through and change of use, so commenced demolitions of the partition wall between the ' former stable' and house.
Much dust ????
LOL
30/3/2013 Ceiling height in the Stable heightened slightly, and the rotten timber joists removed.
Okay maybe i need a skip......
4/5/2013 Major work started forming the space for the new Bifold door , creating an entrance to the Kitchen. Not my most favourite time haha basically holding your house up with acro props.....
Oh god i hate stone walls , they just keep falling apart!!
While the foundation for the supporting wall was drying, increased the boundary wall to 6ft.
I beams installed.
Really happy with how it finished off... and 1 major job ticked off the big list of things to do.
17-19/5/2013 Time for a new floor !
7x3 joists, 5mm Steel wall plates, M24 SS Threaded rod. The outside still needs finishing of and pointing in.
1/3/2014 to 8/3/2014 - Started preparing the Kitchen/Utility ready for UFH to be layed. Screed is getting poured the following week.
What ill do is add the previous progress as i go along in the OP so more to come in the next few days, and all new progress in new posts in this thread.