My House - The Slow Progress

Associate
Joined
15 Jan 2011
Posts
1,435
Location
UK
Well thought id show you guys some of my progress on the "major" refurbishment of my first house. I bought the house originally in May 2012, which basically i spent a year doing very little. But ill try an order the progress from the start to the present.

Plans - So the house is originally a 2 Bedroom, 1 Bath house, i plan to increase this to 3 bed, 2 bath. The house has a old 'barn' attached to it which we have got planning to knock through and increase the living area, both increasing the downs stairs kitchen to include a utility and store (which will house the UFH pump station/consumer unit/and new Combi boiler. It will also increase the bedroom 2 upstairs which will then become the master and have an en-suite added. Now as the kitchen is larger, im hoping to make it a kitchen/Dining room, and free up the old dinging room to create a 3rd down stairs bedroom.

24/6/2012 So this this is how it all started ,an amazing feeling when i got the keys for the first time. Being my first house it will be one big adventure haha. Heres some pictures of how it was, and bear in mind the people who owned it previously had been in there 55 years !!.
Kitchen-
IdMdQoPl.jpg

Dining Room-
iBJrrv1l.jpg

View of kitchen from Dining room-
vHwdbX4l.jpg

Hallway-
gWJgOOIl.jpg

Stairway-
WxR0Mz9l.jpg

zQhR7kFl.jpg

Bedroom 1-
UBiAzZ1l.jpg

DNe0Am5l.jpg

Bedroom 2-
5apa0dTl.jpg

fwtRunDl.jpg

Outside-
phgtgKwl.jpg

5GOYR0vl.jpg

QoxUibTl.jpg

e1QBeSrl.jpg



22/7/2012 Work started outside, to create a bit of privacy and gain some much needed space.
Q4Pqo5Kl.jpg

Tyg2Yjtl.jpg

pBN2xS1l.jpg

OcayZSml.jpg

FrD2Ly4l.jpg

e5FiKaml.jpg

JGMAAIfl.jpg

AwLjEx4l.jpg

MyooQNhl.jpg


23/7/2012-25/7/2012 Further progress outside and removal of the horrid carpets in the bedrooms haha
VVtqjeml.jpg

uZYq3i0l.jpg

4VIwdlbl.jpg

db9YWhul.jpg

0oB2p8kl.jpg

EM2wHw1l.jpg

EAePiLjl.jpg



21/2/2013 After a long break due to work, started work on the hallway and stairs. DEMOLITION has begun!
A4KuKHdl.jpg

hi64g5bl.jpg

SqVG5Vol.jpg

VQsFj38l.jpg

h5NceOVl.jpg

E5Xy9Bjl.jpg

WCwCds7l.jpg

FBuPfw1l.jpg

SEKMR6nl.jpg

rnEiJMvl.jpg

EAFyhQnl.jpg



17/3/2013 So the planning came through and change of use, so commenced demolitions of the partition wall between the ' former stable' and house.
dyNCyf6l.jpg

gCle3Vbl.jpg

zWdBDaRl.jpg

Much dust ????
4jqfhd7l.jpg

B6ZaGTOl.jpg

NoR2T9Bl.jpg

7hBQRczl.jpg

l0puNb7l.jpg

ZS4Etakl.jpg

LOL
L9GHAh7l.jpg

Ge9f8LKl.jpg


30/3/2013 Ceiling height in the Stable heightened slightly, and the rotten timber joists removed.
xomCvsOl.jpg

j46qqbwl.jpg

Gxu3h1Ll.jpg

XmA5RE7l.jpg

tQXYBdnl.jpg

ug2lk8kl.jpg

kJf8FK1l.jpg

nKOccTql.jpg

Okay maybe i need a skip......
SXtpcnhl.jpg

gZdy1lDl.jpg



4/5/2013 Major work started forming the space for the new Bifold door , creating an entrance to the Kitchen. Not my most favourite time haha basically holding your house up with acro props.....
6qkXOeol.jpg

dsevqHjl.jpg

wPK5hAsl.jpg

EX4VH6Fl.jpg

U7F2nmQl.jpg

Oh god i hate stone walls , they just keep falling apart!!
LVLHOxol.jpg

YPJn5tQl.jpg

While the foundation for the supporting wall was drying, increased the boundary wall to 6ft.
fA1jj8jl.jpg

aQ5HG88l.jpg

iPXJpdBl.jpg

qnygV3gl.jpg

VMOryXBl.jpg

XayTX2gl.jpg

kR2fI28l.jpg

I beams installed.
IjI2gFpl.jpg

O789nLLl.jpg

NBCbDBkl.jpg

C1dlhudl.jpg

Really happy with how it finished off... and 1 major job ticked off the big list of things to do.

17-19/5/2013 Time for a new floor !
JYW2gojl.jpg

kxZ8yXcl.jpg

pgn5goxl.jpg

fiFCasrl.jpg

JQzZAbgl.jpg

ABTbV5Xl.jpg

N1FsUHtl.jpg

oMAICIBl.jpg

oK2JnNbl.jpg

QooKQcTl.jpg

Frd1yb8l.jpg

tYk5Vizl.jpg

7x3 joists, 5mm Steel wall plates, M24 SS Threaded rod. The outside still needs finishing of and pointing in.

1/3/2014 to 8/3/2014 - Started preparing the Kitchen/Utility ready for UFH to be layed. Screed is getting poured the following week.
xic8CgUl.jpg.png

QgsZ3c1l.jpg.png

ZS6vlVml.jpg.png

rlKfRQGl.jpg.png

xNKdKdrl.jpg

9Fv11Rgl.jpg.png

oc09xcPl.jpg

MBjRyvml.jpg.png


What ill do is add the previous progress as i go along in the OP so more to come in the next few days, and all new progress in new posts in this thread.
 
Last edited:
What are your options if something breaks under the levelling compound? Rip it all up with a jackhammer or put up with it not working? Really fancy ufh but slightly nervous about this aspect of it.

And what about those that already have a concrete floor and can't afford the extra floor height of another layer of floor?
 
Nothing should in theory break, as there are no joins in the system. There are 3 zones , Kitchen/Dining/Utility all of which have 80m runs each of pert-al-pert pipe.

If there was an issue then, your pretty ****ed....Like i say the chances are pretty slim if its all pressure tested and kept pressurized and monitored at 3-4Bar (40-50psi) during the screed pour. I think it will be fine.

You can get insulation boards which overlay on your concrete so you can have a water UFH system. or the other option is the electric matting, this option you would have less floor height loss.

I will post up tomorrow the progress of before the concrete sub-floor was poured.
 
LOL I was just looking at the carpets. Interesting mix :)

Looking forward to some more pictures of the renovation.
 
Mine will only be come with parts guarantee, as im doing all the work myself apart from pouring the screed. Which is by coincedance is getting poured as i type! Woot Woot!
 
14/3/2014 Screed being poured into the kitchen/Utility seems the final biggest messy job to get done... its awesome how it sets as if you touch it after a few hours its like rubber haha and got complemented by the screeders at how good the UFH had been layed . So that made my day.

IttSy6Il.jpg

NAv8KEyl.jpg

68Ss9X3l.jpg

RbxFNSul.jpg

8srcloil.jpg

5R9u3VVl.jpg

SXqtu6Sl.jpg


So impressed with it, costs lots of ££££ compared to standard sand and cement. But god damn its good stuff. Oh well now the 4 days of not walking on it , its so tempting haha.
 
Last edited:
Loving those original carpets !!!

Nice underfloor heating, i'm planning the same in our garage conversion. Did you get specialists to fit it?
 
I've never heard of getting a 25 year guarantee before , I know a lot offer a 10 year guarantee. But that would only be necessary if there where joins under the screed, as i have no joins and 1 pipe run for each port. There will be no issues, as long as the system has been pressure tested and screed poured, whiled under pressure to observe pressure dropped with damage caused during the pour.
I am more then competent to install , and as you can see the job has been completed to a good standard. Please search the internet at some installs......
All that matters in the end is that i am happy with it, and im ecstatic.
 
There was a range of emotions as I looked down the photos. Started off with ' that's a nice kitchen, doesn't look like it needs a lot of work'. Then I saw some carpet and started things 'ok'... then the angles under and around the stairs, then the wood cladding and more carpet, then, omg, the shapely doors!

What did the neighbours think of your breeze block wall right outside their window? They should paint it white, it might bring in more light.
 
What did the neighbours think of your breeze block wall right outside their window? They should paint it white, it might bring in more light.

I would hate to live in that bungalow in the first place purely on the fact that the OP's house looks down onto it. Even before the breeze block wall.
 