** NEW PRODUCTS ARRIVED AT OcUK!! **

I think it will be 1st or 2nd Week of August. Supplier stock arrives to them on the 21st July roughly.
 
Last edited:
My order status has changed to 'Order Allocated' - I've no idea what this means in terms of when I get it, but I'm viewing any change as positive :)
Pretty sure all that means is you've got one of the number that have been confirmed as arriving, just we have no idea exactly when. @Robbie_G ?
 
Last edited:
My order status has changed to 'Order Allocated' - I've no idea what this means in terms of when I get it, but I'm viewing any change as positive :)

Mine is the same. I taking that to mean stock is coming and they've reserved a unit to fulfill the order.
 
There was some chatter in the water cooling forum on this, Rev 2.0 uses a different pump (moving to Asetek) rather than with Rev 1 using Lian Li's own pump.

It's meant to address all of the issues that have been happening with the rev 1 versions and the grinding pump noises.
 
There was some chatter in the water cooling forum on this, Rev 2.0 uses a different pump (moving to Asetek) rather than with Rev 1 using Lian Li's own pump.

It's meant to address all of the issues that have been happening with the rev 1 versions and the grinding pump noises.
Do you have the link i cant find it?
 
Back
Top Bottom