My order status has changed to 'Order Allocated' - I've no idea what this means in terms of when I get it, but I'm viewing any change as positiveThe Dan cases were due this week and I have an ITX build on my desk gathering dust
Do you have any update please?
Pretty sure all that means is you've got one of the number that have been confirmed as arriving, just we have no idea exactly when. @Robbie_G ?My order status has changed to 'Order Allocated' - I've no idea what this means in terms of when I get it, but I'm viewing any change as positive
My order status has changed to 'Order Allocated' - I've no idea what this means in terms of when I get it, but I'm viewing any change as positive
DPD: We’re expecting your Overclockers parcel. We'll be in touch when we have it and it's out for delivery
I just received that email too but was told I didn't make the cut a couple of weeks agoGood news! - the only thing I'm expecting is the Dan case:
Well, I just also got a collection notice and tracking number from DPD, so something is coming....I just received that email too but was told I didn't make the cut a couple of weeks ago
There was some chatter in the water cooling forum on this, Rev 2.0 uses a different pump (moving to Asetek) rather than with Rev 1 using Lian Li's own pump.@Gibbo
Sorry to ping you mate but any idea whats changed from Rev 1.0 to Rev 2.0 to create a new listing??
Rev 1.0 : https://www.overclockers.co.uk/lian...o-360mm-cpu-water-cooler-black-hs-00q-ll.html
Rev 2.0 : https://www.overclockers.co.uk/lian...0mm-cpu-water-cooler-black-coo-lia-01077.html
Do you have the link i cant find it?There was some chatter in the water cooling forum on this, Rev 2.0 uses a different pump (moving to Asetek) rather than with Rev 1 using Lian Li's own pump.
It's meant to address all of the issues that have been happening with the rev 1 versions and the grinding pump noises.