Sorry for the delay guys on posting a update on this joker project.....been a rough few days,
So here it is the semi finished project after many many issues with the loop, with leaks from fittings that didn't sit flush to the radiator, the EK dual terminal being faulty and not siting correctly on the GPUS causing tiny beads of fluid coming out, then to only find out that the O-rings was shredded with causing the leak as well as the EK terminal.....(that was a bad day as the whole GPU loop had to be drained)
So today i got rid of the EK terminal and went back to the old EK fittings that came with the GPU water block, only issue with that was that i needed a spacer for the outlet on the top....
When i finally attached it all and filled it again, no surprise again with my bad luck this week, it was leaking from the spacer and guess what caused that leak? O-ring was not sitting correctly. but after some simple repairs I can safely say that both loops in the system work great.
Next steps:
1, Wait for my modded cables 3-4 weeks in the mean time using standard old black cables
2, Overclock CPU and GPU.
3, Stress test it and then benchmark it.
4, Oh and add some white LEDS to lighten it all up