Impossible to answer this question as it's subject to too many unknown variables.
If everything lines up perfectly and there's no tiling required then it'll obviously be way quicker than if it needs new pipework, the drain needs modifying, the tiles don't go low enough for the new bath / toilet, etc. A hundred things could make this a three day job or more.