Solar panel production figures

Awful day in Devon as well a poor 6.50Kwh made on the house the lowest day I have had on the house system from it's fitting date March 18 this year so no hot water no export as well and the two 9.5 battery's on the house at 20.15 sitting at a low 35% and falling fast
no chance of making it over night on them.
The workshop made 2.10Kwh battery's at 50% so about 200Amp in them at the 12v Hybrid inverter and should just last the night if we are lucky it has to power the Koi pond over night 250w for 11 to 12 hours or it will flick over to the mains. it has not dun that since early March and the winter running power of 100w over night on the pond


House System is East West
down in not so sunny Devon.
East 8 x 420w panels 45 deg pitch
West 10 x 420w panels 45 deg pitch
Givenergy Gen3 5kwh hybrid
2 x 9.5 battery's

Workshop system is South/East
2440w of panels two 720w strings
one 1000w string
Hybrid inverter with 4x 12v 100Amp
Battery's
Plus grid tie inverter as well
 