STS-135 - The Final Space Shuttle Mission

Man of Honour
OP
Joined
9 Jan 2007
Posts
164,581
Location
Metropolis
Mission control is back in action, so a couple of stunners from the launch:


567791mainlaunchhq1024.jpg


567439mainlaunch4800.jpg
 
Man of Honour
OP
Joined
9 Jan 2007
Posts
164,581
Location
Metropolis
Flight Day 1 highlights


Yesterday we had:

Flight Day 2

• Atlantis’ Thermal Protection System heat shield survey with Shuttle Robotic Arm/ Orbiter Boom Sensor System (OBSS)
• Centerline Camera Installation
• Orbiter Docking System Ring Extension
• Rendezvous tools checkout​

The crew will get their wake up call in four minutes and the plan for today is:

Flight Day 3:

• Rendezvous with the International Space Station
• Rendezvous Pitch Maneuver Photography of Atlantis’ Thermal Protection System by Expedition 28 crew members Fossum and Furukawa
• Docking to Harmony/Pressurized Mating Adapter-2
• Hatch Opening and Welcoming
• Canadarm2 robotic arm handoff of OBSS to Shuttle robotic arm​

Docking will be at 16:09 BST (11:09 EDT)
 
Man of Honour
OP
Joined
9 Jan 2007
Posts
164,581
Location
Metropolis


The plan for today is:

Flight Day 4:

• Canadarm2 robotic arm unberth of the Raffaello Multi-Purpose Logistics Module from Atlantis’ payload bay and installation on the nadir port of Harmony
• Ingress into Raffaello for the start of cargo transfer operations
• Spacewalk procedure review​
 
Man of Honour
OP
Joined
9 Jan 2007
Posts
164,581
Location
Metropolis
Yesterday’s highlights:


It's time for the one and only spacewalk. It's due to begin at 13:45 BST (08:45 EDT)

Flight Day 5 :

• In-Suit Light Exercise (ISLE) Preparation and Pre-Breathe by Fossum and Garan
• Spacewalk by Fossum and Garan (Transfer of failed Pump Module from External Stowage Platform-2 (ESP-2) to Atlantis’ cargo bay; transfer of the Robotic Refueling Mission hardware from Atlantis’s payload by to the Enhanced Orbital Replacement Unit Temporary Platform on the DEXTRE robot; installation of the MISSE-8 Optical Reflector Materials Experiment Ram/Wake hardware on ESP-2)
• Cargo transfer from Raffaello to ISS​
 
Back
Top Bottom