Hi guys i am thinking about using a t-line and am wondering how to set it up properly.
as i see it it has to be on the hose that is going into the pump, and should have a cap on the end.
but:
how long should it be?
how do i bleed the system with it?
what methods do you recommend to fill via it?
thanks
daven
as i see it it has to be on the hose that is going into the pump, and should have a cap on the end.
but:
how long should it be?
how do i bleed the system with it?
what methods do you recommend to fill via it?
thanks
daven