The Man-Cave

Soldato
Joined
9 Dec 2006
Posts
9,289
Location
@ManCave
The Man-Cave [99.9% Complete!]

My Man Cave arrived
Meet your Dreams!


it was specially made for me
extras I added on like:
extra room inside
double glazing
different windows than standard
extra window in the extra room
Tall Construction (2 beams higher than standard
Bigger josts 3x4 not 2x4
Extra room will be toilet facilities :D & little storage
These are the day its built. shall get more soon,

cabin-1.jpg


cabin-2.jpg


cabin-3.jpg


Air con 5KW Office unit to sit outside does Hot & Cold & time sensor

cabin-5.jpg


I've also ripped out a bathroom in my garage (close to the man cave) to put a new suite in So I can have my own toilet facilities in the Man-cave & full bathroom in the house :D

COMPLETED (List Below)
Add 8 Triple Sockets (Power)
Add 2 Double Sockets (Power)
70mm Celotex Insulation in Roof & Floor
10mm Armoured cable Fitted - Complete
Spotlights placed & fitted (inside & out) - Complete
Floor - To be Bought & fitted
Satellite cable to run
2x Cat 6 to be run to the Man-Cave
paint man cave - complete


Few things i'm setting up in their
50m of Cat6 for Broadband connection
2x 8 port switches
1x 24 port switch
Sky TV
Home Cinmea
Computers
spare bed for guests & if i'm to lazy
 
Last edited:
When will it be my turn?!

Can I ask how much that set you back/what your budget is for the project?
Cabin was 7500 with all the extras
Insulation was 800
Base 800
Spent 8.5k pound already, estimate 11k by the time its finished :D

Bah, that's as big as my studio flat.
But I also have it only for myself :-)
Great man-cave indeed, but now you need equally huge rig and some gadgets to get rid of the empty space.
I recommend large fridge for beer, a must have in any man-cave :-)

Some Stuff Going in their:
Computer Stuff
1x 2319WM 2560x1080 2x 23" DELL 1080p
Gaming Rig - i7 3770k 7990 16GB 4xSSD
USB DAC
AKG K702i

1x 27" SA950D 1080p
15" Laptop - i7 3.4ghz - 16GB ram - 256GB SSD - Nvidia 750 1920x1080
USB DAC

2x 8 port Netgear GS108
1x 24 port Neatgear (get model later)
ASUS 5GHz Router
50m CAT6 to House to Internet connections: 153mb & 24mb
(got have backup internet!)

Cinema/Entertainment
50" Panasonic VT20 3D TV
2TB Sky Box
Cambridge Audio azur 651A
Cambridge Audio DacMAGIC
Tannoy DC6T Reveolutions
PS3 Ultra Slim 250GB
Wii
Bluray Player
108 Bottle Wine Cooler
Nexus 7 for chromecast

Chill out
Double Bed, in-case of guests or lazy for a nap
5KW Air conditioning, hot & cold (can cool entire office floor)
3 seater sofa to match

that's it for now
:D
 
it should have been, haggled with the price should been 8k+. i also went to the manufacturer rather than a middle man. I believe they also want to come back to take pictures for their website after its finished

few odds & sods:
Colour Change:
cabin-1-2.jpg


Triple Sockets
cabin-2-2.jpg


Whats in the ceiling & floor? 70mm thick Insulation:
cabin-3-2.jpg


How it done?
cabin-4-2.jpg


Painted inside with same as outside Medium Oak Barn Paint 60 quid per 5 litres
cabin-6.jpg



10mm thick armoured cable, in theory 60 amps of power
 
Last edited:
This. I'd love to do this but would worry about thieves, especially if there's lots of tech going in there.

It looks amazing man.
Its Covered :D

Surely this is projector territory? I have no idea on your requirement and I'm guessing there's a reason why not ... I just love dem biiiiig screens.

Liking the progress, mooooooooar
never been a fan of projectors always look washed out to me or not very clear

My God this is so awesome!! I want one in my backyard! How many systems will you be putting in there?
at least two possible some Macs too
 
You have windows... Why do you have windows?
A cave isn't supposed to have windows - Especially in a Man Cave, where windows inevitably mean annoying screen glare!!

Windows also mean people can either see what websites you're on, or what you're doing while you're on them, but that particular trauma is their own fault for spying anyway!! :D

lol that's what curtains are for? or sayingi should run unix :D
 
so i'm also doing the 2 bathrooms for the ManCave

1 inside the mancave with toilet
1 close to the mancave with toilet Shower & Sink

Here in the one close to the mancave, Plasterer coming tomorrow tiling being done in 2 weeks

Bathroom-1.jpg

Bathroom-2.jpg
 
few things I got already:
2x 8 port switches, 2x 50m Cat6 1x 15M HDMI & using 15m Toslink
upgrades1.jpg


These are currently in the spare room ready to move in the cabin
upgrades2.jpg


upgrades3.jpg


Need to restock

upgrades4.jpg
 
Bit of an update:

the new Ceiling :)
cabin-s2-1.jpg


New floor
cabin-s2-10.jpg


MDPE possibly for Ethernet run
cabin-s2-2.jpg


Bathroom now
cabin-s2-3.jpg


Paint now its dry
cabin-s2-4.jpg


wiring
cabin-s2-5.jpg


Outside switch too!
cabin-s2-6.jpg


inside dimmer #1 of 2
cabin-s2-7.jpg


Batton for Ceiling connected to
cabin-s2-8.jpg
 
Bare wood,

was going to board it, but wood expands & after talking with the Manufacturer (met the builders in person as I went to their factory, cut out the middle man) he said it can expand up to an inch in a year.

so if I board it all and it expands by a inch there be gaps appearing or cracked boards. so bare wood. & got admit it looks cool :cool:

kind of want to look like a cabin in the woods like American films now :D
 
That's a good point.

Expect it could get quite warm in there in the summer months, good job your're installing air con.

yeah Good Air Con to.. should been close to a 1000 pound for aircon. got it cheaper :)

but it was hot the other day and the Insulation board was hot but the room was very cool. so that 70mm or 3" of insulation in roof & Ceiling as well as the air void between roof & insulation is helping it keep warm & cool:D
 
had some family helping during the week.

Ceiling is Up & painted with spotlight holes
Floor is almost put down (another few hours tomorrow that be finished)
they managed what I asked. so all the join are in the same place on every other board like:
-----|
-|
-----|
-|

Electrician is hopefully coming monday to finish off lights :)

will get some pictures of it for you soon:D

in just over 2 weeks the following has been done
Cabin Built
Add 8 Triple Sockets (Power)
Add 2 Double Sockets (Power)
70mm Celotex Insulation in Roof & Floor
10mm Armoured cable Fitted - Complete by Electrician
Spotlights placed & fitted (inside & out) - near complete
Floor - To be Bought & fitted - nearly fully fitted
 
Last edited:
Back
Top Bottom