3 weeks today we moved. Making ours is well on the way. Main bedroom waiting on 3rd coat of paint later today. Then it’s glossing, final checks and then carpet to finish. Waiting for a date for carpet fitter.
living room has been stripped back. Wallpaper all off. Every time a piece comes off I find another crack in a wall. Lots of filler needed. Nothing serious as didn’t show through the paper put up in 1982. Walls are all signed by the kids who lived here before with their ages and a date.
bricked up chimney and installed air brick to let it breathe. It now whistles in high wind but wanted rid of a horrible 1970s gas fire that was there before. Electric fire going in it’s place.
coving up in bedroom and living room. Just hallway to do today if I can.
we stripped back downstairs carpet to check the slab. Turns out it’s carpet and underlay on a parquet floor. Flooring guy suggested taking it out and selling it as it’s not to our taste. Apparently goes for a lot for refurb/reclamation. eBay prices silly high but not interested in selling in small batches. Once it’s out will be time for new LVT/laminate throughout. 45m2 of flooring in 1 run and will probably need levelling first.
Bathroom guy/plumber due today or tomorrow to discuss both bathrooms. Yay. More demolition.
All in all. Busy 3 weeks and doesn’t seem like yesterday we exchanged and I worried something would come up.
living room has been stripped back. Wallpaper all off. Every time a piece comes off I find another crack in a wall. Lots of filler needed. Nothing serious as didn’t show through the paper put up in 1982. Walls are all signed by the kids who lived here before with their ages and a date.
bricked up chimney and installed air brick to let it breathe. It now whistles in high wind but wanted rid of a horrible 1970s gas fire that was there before. Electric fire going in it’s place.
coving up in bedroom and living room. Just hallway to do today if I can.
we stripped back downstairs carpet to check the slab. Turns out it’s carpet and underlay on a parquet floor. Flooring guy suggested taking it out and selling it as it’s not to our taste. Apparently goes for a lot for refurb/reclamation. eBay prices silly high but not interested in selling in small batches. Once it’s out will be time for new LVT/laminate throughout. 45m2 of flooring in 1 run and will probably need levelling first.
Bathroom guy/plumber due today or tomorrow to discuss both bathrooms. Yay. More demolition.
All in all. Busy 3 weeks and doesn’t seem like yesterday we exchanged and I worried something would come up.