I know I am!
I've just knocked an 8.5K work Planning and Scheduling assignment on the head, which was based on planning the production sequence/facilities/layout, estimating and applying costs etc for the manufacture of table saws (of all things).
Two weeks hammering away every free evening for several hours and all the free weekend time I had.
It's not over though, I've got 8 weeks to do another 3 assignments. All of similar length.
I knew I should've got higher education out the way sooner!
So, who else is going to be shacked up in their office for the next X weeks?
I've just knocked an 8.5K work Planning and Scheduling assignment on the head, which was based on planning the production sequence/facilities/layout, estimating and applying costs etc for the manufacture of table saws (of all things).
Two weeks hammering away every free evening for several hours and all the free weekend time I had.
It's not over though, I've got 8 weeks to do another 3 assignments. All of similar length.
I knew I should've got higher education out the way sooner!
So, who else is going to be shacked up in their office for the next X weeks?