Been a while since I updated... yeah yeah, sloooooow I know.

Good news is that the cave is well on the way to being done. In terms of actual construction, all I need to do is the door and window sills and then it's done... unless I build another work table at the back (more on that later - I'm after opinions!).

So it's all mostly done now... just some hiding of wires and little finishing touches left. I finished off the printer table and then had a duh moment. There is a multi power strip in the unit that powers the printer and fridge, but of course once I had tucked the power supply away on it's little hidden shelf I realised I can either have the fridge and the printer on, or both off... but with no power switch on the printer I couldn't have the fridge always on and the printer only on when I want it. Durr! So stupid sometimes...

My solution was to add a spur socket switch on the line between power strip and printer. Now I can turn on the printer when needed (also note the ventilation for the power supply).

7Qivx02.jpg


8MFMXWy.jpg


ljXUsNi.jpg


Most important part of the build:

stHWNeb.jpg



Also been working on my CNC machine... I have built a water tray and shield, next I need to just machine out a level bed from it, then attach a 6mm alu plate which I'll drill and tap as a tooling plate. This means I'll now be able to machine Carbon Fibre underwater to avoid any dust issues, and I should be able to use flood coolant on aluminium. Happy days!

wUEV78D.jpg


YxkXlS2.jpg


7Eg3JpJ.jpg


27pmQmb.jpg



I have some further plans for the CNC before it's fully up and running - I've got an ethernet smoothstepper on the way, and I'm currently eying up some closed loop easyservo steppers. The bonus there is more power and the fact that it can't lose steps, increasing reliability... The cable chains were already getting a bit crowded so I've got some sliiiiiightly more beefy units to put on to make space for the extra wires and coolant lines etc.

yHDhwbg.jpg



Some general pics:

qJItwHj.jpg


FK0I0sz.jpg


esb13RU.jpg


yxOTHI2.jpg


And yes, landscaping of the garden comes next


Girlfriend bought me this drinks mat - think that's acceptance?

18mvbDD.jpg



So my current conundrum is what to do down the far end - here:

RpIafBr.jpg



Should I stick to the original plan of a small sofa for chilling out, or should I build another small worktop down the end (potentially with a view to moving the CNC machine down there to gain more space around the main work area)?
 
Cheers guys, very kind :)


Stick a sofa in there for chilling.
That is screaming out for outside decking with a few chairs for those Summer evenings. Some beers and just relax.

Awesome build man. Awesome.

Actually I already built a nice deck out the back of the house - it's a good little sun trap in the afternoon/evening... I was planning a very small deck out the front of the man cave but anything large enough to actually sit on would eat up too much garden space... my plan was that a small deck out the front would give the impression of more space when the doors are fully opened up.

the deck, before and after:

KYbJ8NG.jpg


BeUHzxe.jpg


u5yZiJ3.jpg


SyAY0ZG.jpg



Cenedd - haha, you see I headed off the missus by letting her have the study as her work space. I'm actually hoping to set her up with a business she can run from there later in the year.

I think i'm leaning towards more workspace and seeing if I can squeeze in a single recliner sofa - combined with the PC chair and the bar stool that should be sufficient seating. The area to the side of the cave will be a patio area (perhaps with a fire pit) and i'll see what options I have for making it covered to increase the year-round utility.

!bluetonic! - nothing but the best lol.
 
haha cheers TechMinerUK - I would love to build my own house one day :)

FL630 - it's just a typical TV VESA wall mounting bracket from amazon for about £12
 