I got the door hung; a bit of fettling and it went on fine. I've ordered new brackets which'll come tomorrow. It is now primed but I didn't take a pic.
And got the dado hung:
N.b. I'm super pleased with the returns on the dado. Mitre saw ftw. I haven't gone into the window because a shutter will arrive shortly and fit proud to the sill.
Just need to get a new radiator ordered as I really CBA to paint this one. I think game plan is:
* Remove radiator
* Paint wall
- TBC on whether I do the wood in emulsion or furniture paint -- sods law I only have a thimble full of furniture paint left.
* Refit new radiator
* Fit sink
* Do skirting
* Sanitary silicone around toilet/sink.
* Fit toilet roll holder.
Edit: forgot to add, I whacked some Zinsser B.I.N on the exposed plaster after I shamfered the edge with a bit of polyfil. It feels smooth - hoping a thick roller will hide the worst of it. I'll do the sink fractionally higher to hide everything.
Pipes coming out of the floor need boxing as well; but that can wait till I put the new floor down.
And got the dado hung:
N.b. I'm super pleased with the returns on the dado. Mitre saw ftw. I haven't gone into the window because a shutter will arrive shortly and fit proud to the sill.
Just need to get a new radiator ordered as I really CBA to paint this one. I think game plan is:
* Remove radiator
* Paint wall
- TBC on whether I do the wood in emulsion or furniture paint -- sods law I only have a thimble full of furniture paint left.
* Refit new radiator
* Fit sink
* Do skirting
* Sanitary silicone around toilet/sink.
* Fit toilet roll holder.
Edit: forgot to add, I whacked some Zinsser B.I.N on the exposed plaster after I shamfered the edge with a bit of polyfil. It feels smooth - hoping a thick roller will hide the worst of it. I'll do the sink fractionally higher to hide everything.
Pipes coming out of the floor need boxing as well; but that can wait till I put the new floor down.
Last edited: