Thought I would provide a little update to this now that I have had the bathroom work completed.
In the end I went for a company through TrustATrader. I looked at their website and photos of other works they had done. The guy who came to quote was here for about 45 minutes asked lots of questions and took lots of notes and measurements. Quote took about two weeks to come (was cheapest out of 3 I ended up getting and also included a set of basic works to the loft at the same time).
Quote was written and was as follows
• Remove and dispose of bathroom suite.
• Remove and dispose of wall tiles.
• Prepare walls and woodwork ready for painting.
• Apply two coats of white bathroom paint to ceiling.
• Remove and dispose of floor covering.
• Remove and dispose of boxing in around soil pipe.
• Reconstruct allowing shelving to right hand side.
• Apply two coats of colored paint to radiator wall, (colour paint to be supplied).
• Install shelving to right hand side of soil pipe.
• Make good walls ready for tiling. However if walls are plaster boarded and are damaged, there may be an additional cost to replace the plasterboard.
• Install new bath and taps, including new bath panel and reinstall disability grips.
• Tile walls in ceramic tiles, approximately 12sqm required (tiles to be supplied).
• Install new shower and raiser rail.
• Install permanent shower curtain rail.
• Remove existing radiator and install new towel rail. Pipe work for new towel rail to be installed in wall.
• Install wpb board to complete floor area.
• Tile complete floor in ceramic tiles approximately 3sqm (tiles to be supplied).
• Install semi-recessed high quality basin and vanity unit
• Install new toilet, and cistern.with isolation valve.
• Install new solid work top to units.
• Rebox piping in to a tight finish.
• Hang new bathroom door and paint.
• Install extractor fan.
• Fit all accessories supplied.
• Clean and clear all debris from site.
***Customer to supply suites, showers, accessories and tiles and custom panels for shelving***
Work took 11 days to complete. We had a toilet for all 11 days (minus several hours during the day on one day when the floor was being tiled), but no basin or bath for 5days. Thankfully my nan only leaves a few miles away so showering there was possible.
Before
Some progress pictures.
And the completed Bathroom
Have to say I am very pleased with it.