Well, what a disaster today has been.
Openreach engineer turned up only to find that he needed to install additional ducting to run the fibre from the path, through my garden to the house. The problem apparently was that the previous ducting went as far as upto a street light in front of my new house and the engineer was not happy to dig there without knowing what other lines possibly might be in the pathway. So off he went few ohone calls with someone and a lot of chin scratching.
Basically he comes back and says because the job will require additional ducting this needs to go back to BT to approve the additional cost, and im prob looking at another few week delay. Needless to say im not amused, especially considering the order tracker says there was a previous survey visit to the property which gave the all clear for the install.
Luckily i still have 3 weeks left on my tenancy at my apartment so i still have internet access here but assuming openreach dont get their work done by the 20th then im moving into the new house internet or not.