Ah yeah didn’t notice it on the smaller screen earlier. Just saw the blue ropes. Hopefully the switch on won’t be too far away. Amazes me how long these things sit in a “test” phase.Nope, can clearly see the CBT in the picture... I actually have a video which shows them fitting it to the mounting pole inside the footway box.
They were using the ropes to pull in the CBT tails to the splitter down the road.
When I’ve had that issue in the past it’s due to an isp bottleneck.Anyone been having issues with youtube videos playing really slow last few days? everything else is fine except this.
Ah yeah didn’t notice it on the smaller screen earlier. Just saw the blue ropes. Hopefully the switch on won’t be too far away. Amazes me how long these things sit in a “test” phase.
Anyone been having issues with youtube videos playing really slow last few days? everything else is fine except this.
After running that it seems I can get Fiber 250 which is great. Not just to find out if can cancel my Plusnet account, seems my wife renewed it on friday without telling me lolUSwitch doesn't seem to take in to account G.Fast which is what Fibre 100 and Fibre 250 are.
Pop your land-line or address details in here for most accurate details about what's on offer
www.broadbandchecker.btwholesale.com
You have to be within 300m of the cab to get G.Fast
If you are within 14 days you’ll be able to cancel the renewal.After running that it seems I can get Fiber 250 which is great. Not just to find out if can cancel my Plusnet account, seems my wife renewed it on friday without telling me lol
Just had a look and you are right. Now big question is how long would it take for BT conection to go live. Would it take longer than two weeks and would I end up without internet lol. Work from home at the moment so that would be a disasterIf you are within 14 days you’ll be able to cancel the renewal.
Longer due to Covid ?It wouldn't take two weeks
Thanks for all the info but decided not to go through with it as earliest appointment is in April. Will just stick with Plusnet for now and hopefully when this contract expires BT will have FTTP ready for my address.I had my G.Fast installed during lockdown, Openreach guy was safe and sound. The dates I had when ordering were from 5 days onwards so not two week, I just chose the date that I moved in lol
Remember, an engineer will need to attend as they change your standard VDSL faceplate for a specific G.Fast faceplate and he'll need to nip to the local cab to change your line to the higher frequency stuff.
Also, if you plan to not use the BT supplied HomeHub 6, you'll need a G.Fast modem to accompany your router if it doesnt support G.Fast and you'll lose landline ability as their supplied landline is via SIP off the HomeHub
See my post yesterday showing my G.Fast speed - https://www.overclockers.co.uk/forums/posts/34480772
Didnt think of that. Might contact them and see what they say. Thanks for the idea.You should be able to undo your contract renewal with Plusnet and just revert to a rolling tariff
I told them due to Covid and working from home my work will organise internet for me so until than can they put me back on rolling contract. Lets see what they reply with. Thanks again for the ideaJust make something up about how you're moving abroad in 3 months or something if they ask, it shuts the conversation down instantly and they will stop trying to sell you on a renewal.