Dandle, whereabouts and do you work at T5 and who for, BA I presume? I started work airside over at T5BN yesterday (longhaul) and I can say I didn't see any of the problems menttioned here and in the media, I was in a totally different building/area. Saying that, it did take me a long time to get to work, its a bit of a shlap from the the motorcycle park to T5B.
From what I can gather, engineering 's situation isn't too bad, just most of the spares aren't in our stores, they're in the EAA, and the line side stores aren't full yet, but thats no real problem for us. All in all, engineering's move has gone relatively smoothly, at least in our area.
I'm not based in T5 but have been working over there. I was under the impression only T5A S satalite was operational along with EAA I didnt know you guys had moved into T5B but thats all that I saw working on the 26th. I agree from engineerings points of vew it has been pretty smooth(as much as can be expected anyway) but I think the engineering move has been slightly better planned than some of the other areas. The main problems I had on the moving day were the lack of BAA man power on security points. BAA just didnt seem ready or geared up for what was about to happen, as it turns out it doesnt look like a lot of BA was either.lol