DIY ensuite bathroom replacement - build log

Three floor tiles left to set now, which I'll do tomorrow as I need a rest and a beer.

Pretty happy with how it's going so far. I somehow mis measured the top left tile, so I'll trim that down with the grinder tomorrow once the back buttered adhesive has gone off.

0jkTRMJh.jpeg


vlPI7vQh.jpeg
 
Looks good, I battened all the walls then did the bottom row last.

(you'll need your floor bob on or cut bob on or you'll get out of level)
This is a good point. I measured down from a laser line to avoid battens and checked the tops of the first row with a spirit level as I went, adjusting with spacers on the floor where necessary.

I was going to use battens until I watched a YouTube video from someone called Bespoke Bloke, where he basically said don't bother.

This way I save time with battens and don't have to seal screw holes afterwards.
 