Associate
- Joined
- 9 Jan 2009
- Posts
- 88
- Location
- isle of wight
Yeah that could also be a possibility. If I remember correctly early on with Chinese new year someone said they send them by boat and it takes a few weeks.One other possibility - slightly less mad than my conspiracy theory above - is that the supply remains so poor because the number of cards affected by the ROPs issue is significantly higher than 0.5%. Now the defect is known, Nvidia's legal likely will have told them they can't go on selling cards known to potentially be affected, so is it possible significant chunks of supply are having to be hauled back for testing? I think the ROPs thing broke after the "stupidly high stock in March" report, right?
So, 3 weeks to get here and due to arrive this week.
3 weeks to get back to manufacturers
Say 1 week to test the batch and repackage any that pass.
3 weeks to get back to retailers.
This is almost end of April and if missing ROPs is a huge issue, this batch could be a lot smaller than it was meant to be.
5070 was also rumoured to be delayed due to production issues. If still no stock and not delayed again. I wonder if the 9070xt has them worried.
All speculation of course.