This is the last update for a few weeks (Holiday time ) however I've made quite a large amount of progress
As can be seen from the photos I finally sorted out the graphics card, fitted the waterblock and installed the card into the system along with some 90° fittings to help plan and measure my tubing runs. I must admit that the nickel GPU and CPU waterblocks do look very suave.
The next port of call was to measure some test tube using acrylic as a template for my glass cuts. I actually cut 3 pieces however one of them was for another run which ended up changing and being too small, the other cut smashed due to an imperfection where the score had run over so when a small amount of force was applied is smashed in the fitting
Finally the mid plate is almost finished with all the pass through ports in line with each other and the cable holes cut out, the cable holes are going to have combs fixed on the top to cover where they are as originally I wanted the cables to use the plate as a comb however this didn't work due to the holes merging with each other.
That is all for now, I'm hoping to have the system finished when I get back but for now I need to pack my bags
Last edited: