On the list of changes, fill pot going under the top cover but cannot use the original cap, so working on a replacement idea, it will run into a T junction just before the flow metre, also going to raise the flow pipe to the cpu block a bit, this will help to draw the eye away from the flow metre as well, also making a small bracket to fit under the flow metre.
The drain hole works great, but the pipework looks crap, so redoing this, i also need to make i new feed pipe to the flow metre due to moving it central to the ram. Return pipe to the res needs a off valve, will help with draining & allows for correct setting up of the D5 Next, OCD sucks sometimes.
My crimpers and everything i need to build the wiring harnesses has arrive, first time for everything i guess.