I'm happy to report that the last fibre for the star lighting was secured last night so that is now finished. The flex for the black out blind has also now been fitted too.
Still lots to do, I've now got to fit the sound insulation material between the joists above the cinema room and fill and prep the room for wallpaper and paint. I'm going to have the ceiling professionally sprayed so the fibers are not going to be disturbed which could happen if a paint roller is used. It'll also give a nice even finish.
I've also got another room which also needs to be prepped for decoration which will involve a fair bit of wall paper stripping.
So, unfortunately this means it'll be a few weeks before I'll have anything to take a picture of that's worth posting here. Keep watching this space though as I think it'll be worth the wait.
Still lots to do, I've now got to fit the sound insulation material between the joists above the cinema room and fill and prep the room for wallpaper and paint. I'm going to have the ceiling professionally sprayed so the fibers are not going to be disturbed which could happen if a paint roller is used. It'll also give a nice even finish.
I've also got another room which also needs to be prepped for decoration which will involve a fair bit of wall paper stripping.
So, unfortunately this means it'll be a few weeks before I'll have anything to take a picture of that's worth posting here. Keep watching this space though as I think it'll be worth the wait.