Another full day on the cave today; Outer skin is pretty much completed now with window and door holes. Roof will start to make an appearance next weekend (providing it doesn't hammer it down).
Yes the floor is yet to go down and I think the plan is it will go in week after next (once roof is on)
Network cables down to it get there own appreciation image, if you look at the window (top right of image) the gutter is only just above it, internally there is a foot and a half to ceiling height, naturally this means a large cavern from the attic to the gutter and it was an emotional 5 hours threading the cable in! However the fit is brilliant now and the solid conduit (20mm or 3 cat5's) fits beautiful inside the 20mm hole.
The building site
My sidegate and wall had to be chopped out to get the digger in and it's been a very non-private few weeks with the side of the house wide open. Today we also got the wall re-built (to be rendered). Gate will hang next weekend and another coarse on top of the existing one as it would have been unsafe to lay it today.
Finally, a 25mm solid conduit onto the front of the house from attic down to level with the existing hole, this will house 4 cat5 cables going into the attic patch panels. This will be the feed for the man cave (with spare) and to the poe switch for house AP's. Fascia not drilled yet as I didn't have the emotional well being to go another 5 hours trying to thread more cables. The cable coming down the roof is the current cat5 to my receiving gear. This cable is being moved to the attic patch panel as well so the cable won't be cable tied to the back of the drain pipe. In time I'd like to re-do the cable run as I didn't run it originally and I'm not too happy as some of the tie downs have come out.