Slow progress as first fix plumbing and subfloor prep is taking a lot of time, only being able to turn off water and heating at certain points of the week and working around a new job.
Hoping to finally get some ply down later...just have a few more noggins and screws to install as well as the Rockwool acoustic insulation to put down between the joists. Need some supporting timber for the waste pipes too.
I've leak tested all the waste pipes and final connection to the stack and everything looks good.
My new Dewalt jigsaw is an absolute life saver for this job.
Have you considered a free standing bath? Won’t help the budget but I think it would look really good there.
Having done (well, designed and then paid an installer) a few things I learnt.
- get quality fixings, you’ll be using them all the time. Hans grohe are great.
- expoxy grout is a PITA to apply but is impermeable once set and incredibly hard wearing.
- porcelanosa tiles at excellent, they are expensive though. They do a sale 4 times a year with big discounts.
- an alcove/cut out near the shower and bath are great as they give you somewhere to put shampoo, shower gel etc. adding a light inside is a nice touch.
- kudos make great wet room style shower enclosures. Get a hinged deflector panel as it keeps water in and is very easy to clean.
- where mount on the wall, toilet, vanity, brush holder, etc. this makes it super easy to clean.
Considered and rejected a freestanding bath. They look great, yes, but we have rejected on practicality / ease of cleaning grounds. I wanted a big deep soaker tub but I conceded.
I did my ensuite and downstairs loo myself before this project and agree with your points.
Good hardware is key. I've used Grohe before this project but am using Crosswater this time, as they do a full range in a given metal type whereas Hansgrohe brushed metal everything, for example, is very hard to find.
I've not yet used epoxy grout but am planning to for this one. I used Mapei Ultracolour Plus grout in the ensuite and whilst it's good to apply, it does need regular maintenance to keep it looking good.
I'm using Tile Mountain again for my tiles and we've chosen some large 1200 x 600 rectified porcelain. Going to brave 1-1.5mm grout lines this time.
There will be a full-width lit niche as per the images above, as well as a lit niche above the WC. Going to mitre the tiles too, rather than use trim.
Not yet chosen an enclosure so will look into Kudos thanks.
Yes everything is going on the wall where possible as I've done with my ensuite...vanity, WC, charging toothbrush holder.