Easyriders Cinema Room

I have two 2TB drives 'joined' to act as a 4TB share. i join them by making them both dynamic disks and the creating a spanned volume. I then mount and share the volume. Where the files go is handled by the OS but.... there is no build in redundancy. If you span you need to backup to either another spanned volume or something else.

RB

Dude please share you knowledge and experience here

Keeps this thread clean and Dandy. I have loads of questions for you:)
 
I have project 2 under way...Brand new build in another part of the house...If there is enough interest I'll document it....

Just looked only 4 stars for this epic thread?

Lame :p
 
New house build is nearly done...

Last part is the games room

kef2copy.jpg

Forgive the crudity of my design:blush:

kef.jpg


I dont want any visable speakers in this room but I want at least 5.1...I was thinking of placing some Kef ci160.2Qs on either side of the apex in the room..Its single floor standard ceiling level room length is approx 7.7M width 5M

Thoughts?
 
I finished this cinema in 19th Dec 2008

8 years ago :eek::p

Yesterday My beloved BK electronics Gemini Sub Blew...:(

Its had a good innings :p

Its not be turned off in all this time.

BK electronics have been fantastic. I have removed the amp within the sub and posted it back to Tom for repair.

Cost just £40

UK manufacturing and support at its finest!
 
BK are brilliant. I was once working across the road from them and dropped in, they gave me a full tour of the place and spent a while chatting, very nice people and excellent quality subs for bargain prices. I wish they made a bigger one with a 15" driver.

I agree,

They sent me a YouTube video of the amp removal procedure within minutes of my conversation on the phone. And the tip for the hair dryer worked very smoothly!:p
 
Back
Top Bottom