My apartment Project log

Nevermind all that, what you call the puppy :D

Oh and good luck with everything else :)

Barney, he is a havanese!

Give you 30 grand when it's done :p

That would not cover the cost of the kitchen.

Looking Awesome...but a 330l tank and the bath holds 440l, could you not have got a bigger cylinder??

well the 330l tank holds water at 60'C, so you mix it with cold water when you fill the bath. Also the boiler will heat 14 to 15 L/min so the boiler is refilling the cylinder almost as fast as you are filling the bath.
 
Nice build. I think those sloping ceilings would annoy me, but your fully loading up with toys to offset lol.

Are those cable runs going to be properly tidied up before the floor boards are put back down? My cable OCD would kick in big style.
 
Nice build. I think those sloping ceilings would annoy me, but your fully loading up with toys to offset lol.

Are those cable runs going to be properly tidied up before the floor boards are put back down? My cable OCD would kick in big style.

Yes they have been tidied up now.

Maybe I'm missing something but doing this seems madness if you don't want to live in the UK, you're never going to recoup the cost of all this work?

Well when we started the project the idea is that it was going to be our long term home. We should make back everything I spent on the project as I got the space for very little. I have put in top end stuff but I got really good deals on everything.
 
well the 330l tank holds water at 60'C, so you mix it with cold water when you fill the bath. Also the boiler will heat 14 to 15 L/min so the boiler is refilling the cylinder almost as fast as you are filling the bath.

Ah yeah I never thought of that! :cool:
 
market is bad round here mate ;)

haha I hear the market for Supercharged V8 engines is quit bad so with that in mind hows £10k sound for the jag? :p


What is going on to the celotex? I am wondering how you are going to fix the gyproc

cheers

I will install a Lafarge plaster grid system.


Looks like it is going to be a realy nice place. But what is a dressing room and I think it might have been better having the lounge by the balcony, although would not have made that much difference.

Its a room to get dressed in lol, we will probably use it as a study or baby room. .
 
Right we are moving again.

The central vacuums system has been installed in every room.
DSC_0679_zps64accf52.jpg


http://www.nutone.com/products/product/6aa4aec5-ca9f-470d-aaef-933d516aef2e

This thing really sucks!!! it has a 5hp motor in it which produces about 1000 air watts, a Dyson has about 250.

We had to put up a bit of stud work due to the idiots that installed the sprinkler pipes.
DSC_0668_zpsf3981b18.jpg


Joiners at work here in the study
DSC_0680_zps7b58f2d6.jpg

We have insulated the roof with 100mm celotex between the rafters and then 20mm celotex over the top. We had to fix a small damp issue here.
The joiners have done really amazing work.

This is the Kitchen
DSC_0690_zpsf049474d.jpg

We have dot and dab'ed 15mm Sound Block plaster board onto the walls. in total we ordered 7000kg of plaster board which was a nightmare to get into the flat.

I was not happy with the job the plasterers did, they worked really slowly so they have all been fired (they did the dot and dab above). It 4 of them to 7 days to plaster 3 rooms and put a little dot and dab up.

Kitchen plastered
DSC_0671_zps738e130c.jpg


bed 4 plastered
DSC_0674_zps61e86d49.jpg


Bedroom 3 plastered
DSC_0670_zps8f866c88.jpg

DSC_0669_zps71e67235.jpg
 
Last edited:
Yep its really moving.

Next week all the waste pipes are going in, plastering should be finished in 2 to 3 weeks.

Then the floors will go in along with the UFH.

We finally ordered our kitchen which ended up being 20k over budget but its a REALLY nice kitchen. We had to drop the steam room to help pay for the kitchen.
 
Kitchens more important. Looking forward to that update, most important room in the house and never done correctly outside of self builds, even then most of the time people **** it up.
 
Kitchens more important. Looking forward to that update, most important room in the house and never done correctly outside of self builds, even then most of the time people **** it up.

The kitchen is so well planned it just cant go wrong. We have 3 ovens (miele) which will be floating half way out of the wall (Microwave combi oven, Steam Combi oven, Normal oven) and 2 warming drawers.

Gaggenau full surface induction hob (I have wet dreams about this thing lol)
http://www.youtube.com/watch?v=NYeJiKqg6aA

Gaggenau ceiling extractor hood which can suck 1800m3 per hour

http://formul.ru/_CATALOG_FILES/pro...genau AC 402-180--197931-ac_402-180.83344.jpg
 