I remember the manufacturers on twitter saying stuff like "You'll have your card by the end of October" (EVGA) and "we're ramping up in November, there will be lots of stock" (Asus).
I check the stock thread from Gibbo: "10pc Strix 3090 OC due in next 2-3 days."
haha I mean this is just bizarre. Never seen a launch like this before in the almost 20 years I've been building systems. This is officially the longest I've ever had to wait for a component after placing an order now too. At this rate, being over 350+ in queue for this Strix 3090 OC I'm not expecting to get it until January 2021 and maybe even later than that.
I check the stock thread from Gibbo: "10pc Strix 3090 OC due in next 2-3 days."
haha I mean this is just bizarre. Never seen a launch like this before in the almost 20 years I've been building systems. This is officially the longest I've ever had to wait for a component after placing an order now too. At this rate, being over 350+ in queue for this Strix 3090 OC I'm not expecting to get it until January 2021 and maybe even later than that.