My only concern is they've not listed the G99 DNO application which needs to be done before anything is installed. As your DNO might not even approve export over 3.68kW, so this system might not even be viable until the G99 has been submitted with a decision given by the DNO for your export.
I'm not 100% sure, but I think the Solis inverter will be G100 certified, so if required they can limit the export, if that is the case its not a problem.