I see you have a cat fish
Pruned enough at dusk to allow the final marking for the top of the wall marking. Today's tasks are - mark out the walls, then start some digging for the outer walls + a little bit, then ensure the slab base is reasonably level - this will have MOT Type 1 and the slab but it needs to be deep enough for the pipe work.
Step 2 after this is to ensure the pipes have enough space and for the bottom drain piping. I will order the 45 needed for the BD and some of the other 1" air pipe tubes (I need to take a stock take to remember what I have and what I need). I also need to order the 4" valves.
Then I need to dig the bottom drain channel.
Pruned enough at dusk to allow the final marking for the top of the wall marking. Today's tasks are - mark out the walls, then start some digging for the outer walls + a little bit, then ensure the slab base is reasonably level - this will have MOT Type 1 and the slab but it needs to be deep enough for the pipe work.
Step 2 after this is to ensure the pipes have enough space and for the bottom drain piping. I will order the 45 needed for the BD and some of the other 1" air pipe tubes (I need to take a stock take to remember what I have and what I need). I also need to order the 4" valves.
Then I need to dig the bottom drain channel.