watercooling

ok , got everything i need to start the build ( thanks halfords :p )

263k595.jpg


im gonna start by pre-measuring the tubing for where i want stuff sitting in the case but i wanted to run this by you all first, before i start hacking the hose to pieces..

flow order, whats the best way ?

i was thinking: bay res/pump>rad>cpu>gpu>bay res/pump

hopefully thats right, otherwise i need to read a bit more before i start ?

..can anyone confirm?
 
Last edited:
res > pump > block > Rad > Res

simple test loop

Don't forget to swill the RAD out a few timwes with warm tap water and then a final de-ionised.. they ship with all sorts of carp still in there

my res has the pump built in mate, you then say block, cpu or gpu first, im running more than just the cpu block.

perhaps i need to take a break , im confusing myself now :o
 
Back
Top Bottom