I'm a Mechanical Design Engineer (team lead) at a very interesting engineering firm in Sussex. Full on-site manufacturing operation, lots of prototypes and one-offs as well as batch production. Based in electromagnetic physics, I work in research/pre-clinical and clinical MRI, but we also do supercon & resistive electromagnets and work on big physics projects such as the LHC.
So how often do you jimmy the results of your models and surveys so that the developers don't get blamed for messing up or overloading existing transport arteries?
And here we have the most likely candidate for shear incompetent buffoon!
Design small to medium sized Wankel engines for small to medium sized drones (amongst other applications).
Unlucky!