Associate
Still going with the floor levelling, surprised how long it's taking (and how much effort) but have lost a few evenings due to rain.
Joists mostly sistered.
We had a chimney breast removed in this room, the hearth along with the pipe notches caused me hours of fun trying to place noggins and some form of support. Also removed some skirting board ready for wardrobes to be fitted.
And as of tonight, got some boards down. Trimmed all the floorboards so that the boards sit under it even with the levelled joists. Having to use floorboard straps as can't get floorboard clamps around the sistered joists but working surprisingly well for £7 a pop. I'm about 4 days behind where I expected to be but will hopefully power through tomorrow night now I'm clear of the pipework!
Love me a bit of DIY but can't wait to finish this... weekend worth of painting then wardrobes next week, carpet in then done.
Joists mostly sistered.
We had a chimney breast removed in this room, the hearth along with the pipe notches caused me hours of fun trying to place noggins and some form of support. Also removed some skirting board ready for wardrobes to be fitted.
And as of tonight, got some boards down. Trimmed all the floorboards so that the boards sit under it even with the levelled joists. Having to use floorboard straps as can't get floorboard clamps around the sistered joists but working surprisingly well for £7 a pop. I'm about 4 days behind where I expected to be but will hopefully power through tomorrow night now I'm clear of the pipework!
Love me a bit of DIY but can't wait to finish this... weekend worth of painting then wardrobes next week, carpet in then done.