I'm not actually sure how long it took Netomnia to install the network in Livingston. The work is still going on.It's probably going to be awhile unfortunately. Netomnia said in October 2022 that Livingston was rolling out. How long did that take for availability?
They said to me yesterday:
"I have looked at your postcode and at this time the works in this direct location are on indefinite hold. The pre-existing services that our team were hoping to utilise are not suitable to be used.
We often look to deploy and use a build method known as Physical Infrastructure Access (PIA). Physical infrastructure access solution is an Openreach product which allows communication providers access to poles and duct for their own installation. Communications providers could utilise this infrastructure to deploy their own fibre networks. Upon inspection, we realised that this was not viable for us to complete a roll out in this direct location.
I can see that the whole the area is required a re-plan/redesign of the network build, your address included.
Over the coming months, our design team will work on this to determine if a viable method and route can be found to complete the connections."
So probably December 2024... maybe.
I didn't actually know what was going on until I got a YouFibre leaflet through my door and looked into them, that's when I noticed Netomnia vans more often around the local area.
It certainly sounds like it won't be happening for you anytime soon unfortunately, if they can't use the existing Openreach ducts