Thinking about doing some guttering and drainage improvements around my house

Not repointing the entire wall no but replacing bricks in the corner and repointing that area, and replacing bricks where the pipes have been put through, and bricking up the window. He has allowed 3 days work plus materials so I guess it will be however much he can get done in 3 days which for a proper brickie should be quite a bit?

The repointing needs doing on the whole house but once this corner is repaired then there is less urgency and I can work on it a bit at a time.
Have you considered just getting a brick repointing quote with a few repairs thrown in? :S
 
Why are you all so against me doing the job properly?

If you were buying this house and saw this I think you'd be trying to knock at least a couple grand off asking price for this potential repair work.

Old houses will need external brick repair eventually Im struggling to understand why you're against trying to do a professional job of it.
 
Why are you all so against me doing the job properly?

If you were buying this house and saw this I think you'd be trying to knock at least a couple grand off asking price for this potential repair work.

Old houses will need external brick repair eventually Im struggling to understand why you're against trying to do a professional job of it.
Not against it but you are going arse about face. If the brickie repairs the bits, you still need pointing and you haven't solved your gash drainage issues. The ground is still too high vs. air brick etc etc
 
Last edited:
Yeah but tbh any decent brickie will be super quick. 3 days is a long time for what they've quoted.

Ok I'll see what the second guy says then.

3 days didn't seem unreasonable to me, a day to replace bad bricks especially on the corner, a day repointing the area (I guess 3-4 SQM) and then a day bricking up the window.
 
Not against it but you are going arse about face. If the brickie repairs the bits, you still need pointing and you haven't solved your gash drainage issues. The ground is still too high vs. air brick etc etc

Yeah that's true but I'm trying to focus on the more urgent work first (i.e the structural strength of the wall itself) because I can't drop several grand getting someone to repair, repoint the whole wall and rectify the drainage all in one go.

Do you have another suggestion for how I fix everything in one hit or change the order of what I'm doing? I'm not a builder I don't know.
 
Last edited:
Re the airbricks, have you actually looked to see in heavy rain if water is pooling outside them and getting in to them? i.e. do you know that they are actually causing a problem?

If water ingress is an issue, and you want to save money, I would imagine there is a solution where you could block/cover off say the bottom two rows of holes in them, making them watertight, so you could withstand a higher pooling depth, but still have some ventilation.

I guess it depends on how much money you have to spend.
 
Re the airbricks, have you actually looked to see in heavy rain if water is pooling outside them and getting in to them? i.e. do you know that they are actually causing a problem?

If water ingress is an issue, and you want to save money, I would imagine there is a solution where you could block/cover off say the bottom two rows of holes in them, making them watertight, so you could withstand a higher pooling depth, but still have some ventilation.

I guess it depends on how much money you have to spend.

I don't think water is pooling no, although I can't be sure on the ones that are below the level of the block paving out front. I need to lift the block paving at the front to see what is underneath, but there is an acco drain installed at the level of the paving so if I remove the paving this would then be too high.

The problem with this rear corner that I'm focused on at the moment is because a slab was angled towards the house so water was running off the slab to the house and then soaking down into the soil right against the foundation.

I plan to fix this once the brickwork is repaired by installing an acco drain and laying a concrete slab so it falls away from the house into this drain, which will then head off down the garden just onto the soil.

The front of the house I'm a bit stuck on because of the levels and what might be under the block paving which I don't know yet.

There's many weekends work here for me as we approach winter which is why I'm willing to pay for someone to come in for the urgent stuff. If I do it it will take me weeks.
 
Yeah that's true but I'm trying to focus on the more urgent work first (i.e the structural strength of the wall itself) because I can't drop several grand getting someone to repair, repoint the whole wall and rectify the drainage all in one go.

Do you have another suggestion for how I fix everything in one hit or change the order of what I'm doing? I'm not a builder I don't know.

I'm not a builder or expert, but what I would say is that you first need to see how your drainage is performing, i.e. identify if you have actual drainage problems, and then do any work necessary to rectify those. So I think it's drainage sorted first, then any cosmetic work to the wall (if necessary) afterwards. Otherwise, if you do the wall first, you might have to redo it after fixing the drainage.
 
Last edited:
Yeah that's true but I'm trying to focus on the more urgent work first (i.e the structural strength of the wall itself) because I can't drop several grand getting someone to repair, repoint the whole wall and rectify the drainage all in one go.

Do you have another suggestion for how I fix everything in one hit or change the order of what I'm doing? I'm not a builder I don't know.
Remember that if this is a double skinned cavity wall that the structural strength ie what holds the roof up is in the internal course of brickwork. Regardless structurally could consider the "if it's lasted this long..."


I would sort the drainage before new brickwork as don't want that to get shot before the drainage sorted. It should be 150mm below DPC or have good mitigation measures in (e.g. Flow away from house, aco drains etc.)
 
Yeah that's true but I'm trying to focus on the more urgent work first (i.e the structural strength of the wall itself) because I can't drop several grand getting someone to repair, repoint the whole wall and rectify the drainage all in one go.

Do you have another suggestion for how I fix everything in one hit or change the order of what I'm doing? I'm not a builder I don't know.
I think folk have already said. But if it ain't broke don't fix it - structurally there isn't an issue. Focus on how you are going to get the drainage sorted and shop around quotes for a repoint and brick repair. £1k sounds quite spenny for the West Mids unless you are guaranteed it is top work with matching bricks.

But I'd also in parallel be getting pipework clear in my head otherwise you'll need him back to brick more up :D Also ground level above air bricks is a no-no.

Is the inside OK?
 